Only one lane of the Pacific Hwy at warrell Creek will be open today between 9.30am and 3pm.
Only one lane of the Pacific Hwy at warrell Creek will be open today between 9.30am and 3pm. TREVOR VEALE

Bridge maintenance to slow highway traffic at Warrell Creek

ONE lane of the Pacific Hwy will be closed temporarily today so the bridges over Warrell Creek and Upper Warrell Creek can be inspected to inform future maintenance work.

Work crews will inspect areas underneath each bridge requiring the lane closure to ensure safety between 9.30am and 3pm.

Motorists will be directed by traffic controllers and reduced speed limits will be in place.



From market garden to market leader

From market garden to market leader

New property development comes with a dose of history

The Advocate's fresh new look online

The Advocate's fresh new look online

Today has seen the launch of a new look Advocate website

Mum would rather another crash than getting caught in a rip

Mum would rather another crash than getting caught in a rip

A mother of two is lucky to be alive after being pulled from a rip

Local Partners